Avdiivka coke plant

 2016.05. Ukraine. An emergency standby power plant EG2500, “mobile” version, was supplied.

EG2500

Mobile power plant EG2500 before being sent to the facility, in the assembly shop

AI-20DME

View from the inside of EG2500 in the engine compartment. Visible AI-20DME gas turbine drive and oil tank (brown on the right)

Mnemonic scheme

Mnemonic control scheme of the power plant EG2500

Zhanazhol Gas Turbine Power Plant (GTPP)

2015. Kazakhstan. An automated control system for the technological process of the power plant was supplied. The power plant was built on the basis of 2 DC-59 gas turbine drives and 9 DJ-59 gas turbine drives. The total capacity of the power plant is 176 MW.

Power Plant Operators Room

Workplaces for operators and APCS cabinets

Industrial Site

The GTPP is located on the industrial site of an oil and gas field

Шкаф АСУ ТП

The process control system is based on the software and logistics controller “Bernecker & Rainer” (B&R)

Kumkol Trans Service

2014.07. Kazakhstan. 2 EG2500 gas turbine power plants were supplied, operating on associated petroleum gas.

EG2500

Two gas turbine power plants EG2500 with an air cleaning system (ACU) and noise attenuation units

AI-20DME

Gas turbine drive AI-20DME manufactured by Motor Sich JSC. Fuel equipment is installed on the drive, with a microprocessor control system

Control cabinet

Microprocessor control system for power plant and gas turbine drive

Uralskaya KoGTES, 54 MW

2013. Kazakhstan. An automated process control system for the operation of the entire power plant, gas turbine units NK-18 and waste heat boilers was supplied. The cogeneration power plant was built on the basis of 3 NK-18 gas turbine units and 3 waste heat boilers. The total electrical power is 54 MW. The productivity of waste heat boilers is 20 Gcal/h.

KoGTES-54MW

View of the power plant. Inlet devices and exhaust pipes with waste heat boilers are visible

Mnemonic diagram of the operation of “auxiliary equipment”

Auxiliary equipment includes: heat exchangers, network pumps, waste heat boilers, etc.

Control cabinet

Microprocessor control system for power plant, gas turbine units and waste heat boilers

Anastasievska gas compressor station

2011 Ukraine. Control system of gas turbine drive of gas compressor unit on the basis of GTE D-336 (6MWt)

D-336

Gas turbine engine D-336 capacity 6 MWt

Gas compressor station

Gas compressor agregates view

SAUD-336 Control cabinet

Control cabinet of gas turbine drive of gas compressor unit SAUD-336

GTE Myanmar

2011. Myanmar. An automated control system for the technological process of the power plant was supplied. The power plant was built on the basis of a gas turbine drive of the Zorya-Mashproekt enterprise, with a capacity of 6 MW.

GTE-6 MW

GTE-6 MW installed at the liquefied gas plant, Nyaundown, Myanmar

Gas turbine drive power plant

GTE, with a capacity of 6 MW, produced by “Zorya-Mashproekt”

Power plant control panel

The console combines the automation of the ACS GTE, auxiliary equipment, manual controls and a visualization panel controlled by APROL R3.2

Boiler room on the street. Uralskaya, Dnipro

2009. Ukraine. An automated control system for the technological process of the boiler house, auxiliary equipment and three hot water boilers (KVGM) with a capacity of 20 Gcal/h was supplied.

Control cabinet

Cabinet for automatic process control system for the operation of the boiler room, auxiliary equipment and three hot water boilers

Mnemonic scheme

Mimic diagram of auxiliary equipment, made in the SCADA STAR environment

Turbine hall

View of one of the boilers and cabinet SAUK-20